The network of a European championship: 9,000 spectators, full redundancy, 24/7 support, a solution validated and audited by the European Basketball Federation.

Challenge

The collaboration with the Romanian Basketball Federation covered the European Championship held in the Polivalentă Hall (BT Arena) in Cluj-Napoca. Following the preliminary meeting with the representatives of the Romanian Basketball Federation, we received the organisation’s technical specifications.

They required a fully redundant infrastructure, two data rooms, 3 internet providers, more than 600 network ports and professional wireless, serving simultaneously more than 450 accredited users and more than 9,000 spectators. All the equipment also had to be made available by the suppliers on a rental basis, for the whole duration of the competition.

 

Solutions

To answer every need and ensure the event ran without difficulties, we chose the equipment that matched the requirements exactly, producing the solution architecture and the technical design. The solution comprised Fortigate firewall systems, FortiSwitch switches, Ruckus Wireless equipment, laptops, printers, copiers and monitoring servers.

Following the initial proposal, we organised a meeting with the IT department of the European Basketball Federation, who validated the proposed solution. For the implementation, the existing cabling in the Polivalentă Hall in Cluj-Napoca was extended, on both fibre optic and copper. We then installed and configured the equipment, which passed the technical audit of the European federation. Moreover, throughout the event we guaranteed on-site and phone technical support 24/7.

 

Fully redundant infrastructure for a European championship Three internet providers feed two redundant technical rooms, linked to each other, serving over 600 network ports, professional wireless and over 450 accredited users. // two server rooms, no single point of failure Provider 1Provider 2Provider 3 Server room A redundant hardware Server room B redundant hardware redundant 600+network portsWirelessprofessional450+accredited users // hardware on rental for the duration of the tournament 9,000spectators10+ TBdata transferred24/7on-site support
The solution was validated and audited by the IT department of the European Basketball Federation before the competition.
Results

The IT department of the European Basketball Federation validated our solution and audited the installation. We kept communications uninterrupted for the whole duration of the competition: 9,000 spectators, more than 450 accredited users, 2 redundant technical rooms, 3 internet providers, more than 10 TB of data transmitted, with the equipment delivered entirely on a rental basis and 24/7 on-site support.